When running complex mouse tracks using PC-Lysys under
MS-Windows 3.1 on an 486-PC running Novell Netware,
we encounter frequent hang ups of the program. Some seem
to be systematic. E.g. opening a second dot plot with the
"Draw all dots" option will always hang up the application.
However, multiple dot plots with the "draw all dots" option
are tolerated when opened initially at "First 2000 dots only."
Is this a known bug or due to our configuration?
Furthermore, as an inconsistent error the same mouse track
starting from an empty full size screen frequently results in a
different positioning of windows on the screen. I guess that
this problem is due to calibration problems between the
MS-Windows Recorder, the mouse driver and the VGA adapter.
Are there any suggestions or solutions, e.g. other macro recorder?
Thanks for any help
Gregor Rothe
***********************************************************
Institute for Clinical Chemistry and Laboratory Medicine
University of Regensburg
D-93042 Regensburg, F.R. Germany
Tel. +49 (941) 944-6208, or -6233
Fax +49 (941) 944-6202
Internet: Gregor.Rothe@KLINIK.UNI-REGENSBURG.DE
***********************************************************